Sunday, April 18, 2010

Wharf building development

Below are some sketches from my development of the wharf building form. The key considerations which I developed as I went along were maintaining a clear axis slashed through the centre of the building which is angled towards the New Farm river branch. Also, a physical constraint was that part of the building had to fit through the archway of the Story bridge.








































Further sketchup modelling: (Having transparent glass facade along axis - at night light will leak from axis and front (river and/or wharf walkway) facades of the building.

No comments:

Post a Comment